Great Missenden Estate
    Case Study
    / domestic

    Great Missenden Estate

    Great Missenden, UK

    System Size

    300 m²

    Annual Savings

    £48,000

    Project Overview

    A prime example of the Teratherm Surface in action, this Great Missenden project combines luxury living with industrial-grade engineering. The system heats a 100,000-litre swimming pool, a jacuzzi, and a large helicopter hangar/workshop, all while generating over 200,000 kWh of energy annually.

    Generates over 200,000 kWh annually
    £48,000 annual cost savings
    Heats 480 m² hangar to 19°C
    Maintains 100,000L pool at 28°C
    Jacuzzi maintained at 38°C

    The Challenge

    The estate required a heating solution capable of managing diverse and high-demand thermal loads. This included maintaining a 15m x 5m swimming pool at a consistent 28°C year-round, keeping a Jacuzzi at 38°C, and heating a cavernous 480 m² helicopter hangar and workshop to 19°C. The client sought to achieve this without the exorbitant running costs associated with traditional fossil fuel heating.

    Teratherm Installation Process
    Fig 1.0: High-density collector loops installed prior to surface finishing

    The Solution

    We installed a 300 m² Teratherm system integrated into the estate's driveways and helipad surfaces. The system operates at high efficiency, generating 65-120 Watts per m² to harvest waste heat. This energy is directed to heat pumps that manage the distinct temperature zones: 28°C for the pool, 38°C for the spa, and 19°C for the workshop areas, ensuring optimal performance for both leisure and aviation maintenance.

    Pathway Energy Collectors
    Fig 2.0: Energy collection extends seamlessly into surrounding pathways

    The Results

    The estate now generates over 200,000 kWh of clean energy annually. Financial performance has been exceptional, with achieved savings of £48,000 against previous energy bills and a total electricity running cost of just over £4,200 per year. The system successfully maintains the 100,000-litre pool and large hangar at target temperatures year-round, significantly lowering the property's carbon emissions.

    Project Gallery

    Finished Helipad in Use
    1 / 3

    The system supports full aviation loads while generating energy

    Surface Detail
    2 / 3

    Collector loops on helipad

    Estate Overview
    3 / 3

    Seamless integration into the landscape