M&E and Architectural Resources

    Specify Teratherm

    Comprehensive technical data, independent performance verification, and specification clauses for integrating Surface Thermal infrastructure into commercial and high-end residential projects.

    Verified System Performance

    Seasonal COP (SCOP)

    4.4

    Total system performance (11 Sep 2025 – Present)

    Summer Peak COP

    4.95

    Peak summer operation (11 July 2025 data)

    Sub-Zero Verification

    COP 4.02

    Maintained at -3.9°C ambient (Jan 2025 audit)

    Technical Specification Table

    Verified engineering data for Teratherm surface thermal infrastructure.

    MetricValue / SpecificationVerification Method
    Seasonal COP (SCOP)4.4emoncms
    Thermal Extraction Yield55-57 W/m² (Winter)GSENZH Independent Audit
    System Lifespan50+ YearsMaterials Durability Testing
    Installation Depth50mm (nominal)Precision Laser Guided Placement
    Load Capacity40+ Tonnes/m²Resin-Bound Load Verification

    Technical Data Sheet

    Detailed system parameters, verified performance data, and surface configuration specifications for project feasibility and design integration.

    Request Data Sheet

    GSENZH Verification Report

    Independent third-party analysis of surface collector thermal output, verifying 65-120 W/m² winter energy extraction at Great Missenden Estate. Conducted by the Greater South East Net Zero Hub, January 2026.

    Request Audit Summary

    M&E System Specification

    Technical parameters for incorporating Surface Thermal into building services design, including plant room interface requirements and heat pump output specifications.

    Request Integration Guide

    NBS Specification Clause

    Pre-written NBS clauses for architectural tender documents ensuring the protection of the Surface Thermal standard against inferior alternatives.

    Request NBS Draft